POLAND-RUSSIA Cross-border Cooperation Programme 2014–2020

European Union
 

Environment

Joint response of public healthcare institutions to climate related diseases and health hazardsPR/1/074/2018

Lead beneficiary:
Dr Ludwik Rydygier Voivodeship Hospital in Suwałki (Poland, Podlaskie voivodeship)

Beneficiary:
Chernyakhovsk Central District Hospital (Russia, Kaliningrad Oblast)

Total value of the project
2 170 232.73 €

Co-financing for the project
1 953 209.45 €

Project duration:
24 months

Project description

The main objective of the project is to develop the cooperation between both hospitals in the scope of the most appropriate tools and methods aimed at adaptation to the adverse impact of climate change. 

As part of the project infrastructure component, it is planned to reconstruct and equip the Neurology Ward with the Stroke Sub-department of the Suwałki hospital. The useful area to be reconstructed and equipped equals to 745.8 m². At the same time, the hospital in Chernyakhovsk intends to purchase specialised modern equipment for the Anaesthesiology and Reanimation Ward, the Department of Neurology and the Clinical and diagnostic laboratory.

A significant added value of the project will be ensured by its soft actions that foresee trainings and study visits for the medical staff aimed at increasing their knowledge in the field of impact of climate change on the sickness rate. Apart from the direct benefits for the employees of the hospitals, the project will also contribute to increasing awareness of the population of Suwałki and Chernyakhovsk (including local decision-makers) in the field of the climate change consequences. This will be achieved by organising a cross-border scientific congress and conducting an awareness raising campaign in the project area.

 

LOCATION

Privacy policy

Ustawienia zaawansowane
Ustawienia zaawansowane
UŁATWIENIE DOSTĘPU NA WWW
WIZUALNE
WERSJA KONTRASTOWA
ROZMIAR TEKSTU
1
ODSTĘP POMIĘDZY WIERSZAMI
1
ODSTĘP POMIĘDZY SŁOWAMI
1
ODSTĘP POMIĘDZY LITERAMI
1