POLAND-RUSSIA Cross-border Cooperation Programme 2014–2020
We would like to inform all potential beneficiaries that the Guidelines for feasibility study were prepared and approved.
At the same time, please remember that in case of projects including an infrastructure component equal to at least 1 million EUR value each, the Beneficiaries shall submit full feasibility study in national languages – Polish or Russian together with the brief description in English.
For the infrastructure component less than 1 million EUR, but higher than 50 000 EUR the brief feasibility study is required and shall be provided in the relevant place of the application form.
Simultaneously, please be informed that the Metrics of Project Output and Result Indicators of the Programme were also prepared.
Documents to download
Guidelines for feasibility study (file type: pdf; size: 514 KB)